APA (edition "APA 6") Mathematics and Statistics

Six Sigma

This part of the project has 40 points and is aligned in developing the base data of our project.

    Using the steps developed in Value Stream Mapping, go to 5 people and ask how long it would take to do each step of your process.
    Using the data from this survey, determine the mean and sample deviation for each step.
    Enter this information in the file that says simulation for each step of your process.
    Run the program.
    Using Minitab develop a Time Series Chart and a Descriptive Data table
    Infer about the behavior and trend of values.

Notes:
The values change each time you run the program. Therefore print the run that you will use as the basis for the current situation.
If you have more than 10 steps, insert the spaces you need and copy the columns.